Rehabbing And Refinance Question



[ Edited by shasta9254 on Date 11/13/2005 ]

Comments(2)

  • Cole_2224th October, 2005

    A designer should be able to handle everything.

  • ChrisSanDiego25th October, 2005

    The planning dept is going to want to see a complete set of plans. You need a draftsperson to draw them up. They will also want engineering calcs to accompany them so you will need a structural engineer stamp. An Architect will be subbing these duties out, unless they employ them on staff..

    The cheapest route is to hire a draftsman directly, he will probably know an engineer to stamp his drawings.

    The one-stop pay one-guy route is to hire a Designer..
    A Desinger will be hiring an Architect, a Draftsman and an engineer. Depends on how many people you want to pay and how involved you want to be.