1)drywall (& texture if any)
2)mask off whatever doesn't get paint, which shouldn't be much at this point, and spray everything (WEAR A GOOD RESPIRATOR!!!)
3) Cabinets (some like to put cabinets on top of the flooring in kitchens and bathroom, I've done it both ways.)
4) kitchen & bath flooring
5) Cabinets(if sitting on top of flooring), countertop, all fixtures (toilets, sinks, sockets, switches, coverplates, lights.
6) Carpet
7) Baseboard- You can hang baseboard before the carpet goes in but most carpet installers I've dealt with don't like it.
I do everything except installing carpet or large areas of linoleum.
Hope this helps,